Cheap PriceList for Expansion Valve - Civic Accord – VET Energy Detail:
Auto Engine parts Car Crank Pulley For Honda Civic Accord
Description:
Lightweight Crank Pulleys reduce parasitic drag placed on the crankshaft by underdriving the accessories such as Alternator, Power Steering and Air Conditioning.
Underdriving slows down the accessories to use less energy from the crankshaft but doesn’t slow them down to the point the accessory operation becomes effected.
Most of the power gains are produced from the lightened weight of the crank pulley.
Tests show that an average of 2.7 HP is gained from every pound of weight that is reduced from the crankshaft.
Machined to a high standard and with blue anodized finish.
This reduction in rotating mass helps your engine to release more of the power it is capable of and accelerate faster!
Color: RED
Application:
SUITABLE FOR HONDA B SERIES ENGINES FROM 92-00 B16A B16B B18C
Package:
1X Crank Pulley
Supply Ability:
10000 Piece/Pieces per Month
Packaging & Delivery:
Packing:Standard & Strong Packing
Poly bag + Box + Carton + Pallet
Port:
Ningbo/Shenzhen/Shanghai
Lead Time:
Quantity(Pieces) | 1 – 1000 | >1000 |
Est. Time(days) | 15 | To be negotiated |
Ningbo VET Co.,LTD is a manufacturer specialized in production and sales of special graphite products and automotive metal products in zhejiang province. Using high quality imported graphite material, to independently produce various of shaft bushing, sealing parts, graphite foil, rotor, blade, separator and so on, also with the electromagnetic valve body, valve block and other hardware products. We directly import various specifications of graphite materials from Japan, and supply domestic customers with graphite rod, graphite column, graphite particles, graphite powder and impregnated, impregnated resin graphite rod and graphite tube,etc. We customize graphite products and aluminum alloy products according to the needs of customers, which helps our customers achieve success. In line with the enterprise spirit of “integrity is the foundation, innovation is the driving force, quality is the guarantee”, adhering to the enterprise tenet of “solving problems for customers, creating the future for employees”, and taking “promoting the development of low-carbon and energy-saving cause” as the enterprise mission, we strive to build a first-class brand in the field.
Q1:What are your prices?
Our prices are subject to change on supply and other market factors. We will send you an updated price list after your company contact us for further information.
Q2:Do you have a minimum order quantity?
Yes, we require all international orders to have an ongoing minimum order quantity.
Q3:Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
Q4:What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 15-25 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. In all cases we will try to accommodate your needs. In most cases we are able to do so.
Q5:What kinds of payment methods do you accept?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance before shipment or against the copy of B/L.
Q6:What is the product warranty?
We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone’s satisfaction
Q7:Do you guarantee safe and secure delivery of products?
Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.
Q8:How about the shipping fees?
The shipping cost depends on the way you choose to get the goods. Express is normally the most quickest but also most expensive way. By seafreight is the best solution for big amounts. Exactly freight rates we can only give you if we know the details of amount, weight and way. Please contact us for further information.
Product detail pictures:
Related Product Guide:
DR Congo election campaign: ‘I saw police open fire’ on opposition supporters | Fire Water Cannon
Yellow vest protests hit with police water cannon, tear gas in Paris | Side Spray Kits
Cheap PriceList for Expansion Valve - Civic Accord – VET Energy, The product will supply to all over the world, such as: , , ,
By from -
By from -